- Careful, after removing this element the construction will lose its stability, make sure there is one person (if skilled and strong, otherwise 2 persons) holding the construction in position, until this step has been finished
- Using the above mentioned tools, slightly unscrew all the bolts and nuts holding the Triple bar (4x)
- 1 repairer holds the Triple bar firmly, while the second repairer removes by hand or using the tools the nuts, bolts and washers from the connection
- The component can now be removed by 1 person, while the other person holds the 2 remaining frames in their original position
- The first repairer than carefully pulls the frames to the ground- one by one, to assure an easy access and safe disassembly of the rest of the construction
Note: You will need 2 sets of Ratchet (T001) + ratchet nut (T002). One of them can be also replaced by the ring spanner (T003).